Projects

Altus Medical Clinic Renovation

Location Altus AFB, Oklahoma
Square Footage 26,000 SF


The facility was originally built in 1979 and required considerable upgrades to space efficiencies, the functional arrangement and clinic adjacencies. Additionally, the existing Dental Clinic, which was in a separate building, was incorporated into the first-floor layout of the medical clinic with minimal downtime. Other departments affected included Public Health, Radiology, Mental Health, Family Health, Flight Medicine and common spaces. Renovations were conducted within fully operational and occupied medical clinics. The scope included HazMat abatement; demolition; new interior finishes, including floors, ceilings and walls; new door frames and hardware; new casework; a new signage system; and new HVAC, plumbing, fire protection, medical gas, dental vacuum system, electrical and communications systems.