Projects

Healthcare Campus Modernization

Location Moody AFB, Valdosta, Georgia
Square Footage


This project touched seven buildings with a mix of renovation, addition and new construction work and involved the coordination of multiple architectural and engineering disciplines. Work primarily involved correcting functional issues throughout the campus, with layouts optimized to enhance departmental work flow. During the design charrette, our team developed a LEAN process map with the user groups to confirm the program met their needs and identify key relationships between spaces. Many of the spaces were required to stay operational throughout construction, with some departments renovated in place. Phasing and sequencing were carefully planned to minimize disruption while performing the renovations safely and efficiently and staying on schedule.